Projects/Sustainable Coach House Design

Sustainable Coach House Design

Tools

Revit, Excel

Year

2025

Format

Group Academic Project

Exterior Render

Exterior perspectives showing the coach house form, roof orientation, surrounding landscape, and solar panel placement.

1 / 9

Exterior render of the coach house
View Full Design Package

Project Goal

Design an accessible, energy-efficient coach house that balances comfort, sustainability, affordability, and practical living for aging occupants.

My Contribution

  • Wrote and researched the Technology and Technology Calculations sections, focusing on envelope performance, mechanical systems, renewable energy, and sustainability upgrades
  • Completed appendix calculations for floor area, surface area, window-to-wall ratio, skylight-to-floor ratio, PV sizing, and annual energy generation
  • Researched high-performance materials and systems, including triple glazing, ZIP-R sheathing, dense-pack cellulose, ERV ventilation, and a mini-split heat pump
  • Connected technical decisions to accessibility, affordability, energy efficiency, and net-zero design goals
  • Created the project Gantt chart to coordinate design development, modelling, documentation, and final report milestones

Key Features

Passive Solar Design

South-facing glazing and overhangs support daylight, winter solar gain, and summer shading.

High-Performance Envelope

Improved insulation, triple glazing, and airtight detailing help reduce heat loss.

Energy-Efficient Design

A mini-split heat pump, energy recovery ventilation, and rooftop solar PV help reduce annual energy demand.